To
expedite executive operations of Development
Projects of Petrochemical Industries and to
make use of domestic and foreign
partnerships and investments, the National
Petrochemical Company established
Petrochemical Public Joint-Stock Companies
to implement the projects in the process of
execution. To this end, Amir Kabir
Petrochemical Company was assigned to
implement the 6th Olefin Project
in April 1998.
Amir
Kabir Petrochemical Complex is located at
Bandar imam, on the south of Petrochemical
Special Economic Zone at the Site 4 situated
approximately on Northwest of Petrochemical
Complex of Bandar Imam.
The 6th
Olefin Project is established at a land lot
having a surface area of 55 hectares by Amir
Kabir Petrochemical Company and the first
Plant of which, i.e. Plant HD, was put into
operation in February 2003.
Intermediate products of the said Project
include: 520,000 tons of Ethylene; 185,000
tons of Propylene; 20,000 tons of Buten-1;
260,000 tons of Light Linear Polyethylene;
1,000 tons of Heavy Linear Polyethylene;
300,000 tons of Light Polyethylene; 137,000
of Pyrolysis Gasoline; 50,000 tons of
Butadiene, 24,000 tons of Fuel Oil(CFO)
annually are final products of the said
complex.
All
the Plants of the said Complex, except Light
Polyethylene Plant, are presently in the
process of production and it is anticipated
that the Light Polyethylene Plant, having
annual capacity of 300,000 tons, would be
put into operation in the late 2008.
|